06 - Purchased and merged 「Fooguo Sports (Dong Guan) Ltd.」in June 2010.
10 - The subsidiary, Launch Technologies Co., LTD., obtained the permission of IPO from Security and Futures Commission Ministry of Finance.
08 - AD Group established a subsidiary, Fooguo International Company Ltd., in August, 2009 and purchased ACE Sports Limited, a golf manufacturing company.
2008
04 - Re-introduced SAP system and implemented officially on January 1st, 2009.
11 - The China plant of Advanced International Multitech Co.,Ltd. in Dongguan was graded 4C for both HSE and Labor by Adidas.
2007
11 - Granted "Product Engineering e-Project & Knowledge Platform” from Ministry of Economic Affairs (Mechanism of Manufacturing Construction in Knowledge Management).
11 - Held 20th Anniversary Exhibition.
11 - AD Group Kaohsiung Branch passed AS9100 certification
2006
04 - Obtained the Certificate of Operation Headquarters of Enterprise from the Industrial Development Bureau, Ministry of Economic Affairs.
05 - Advanced invested in Global First Hi-Tech Corp., a company that manufactures carbon fiber products, including hockey clubs, bicycle frames, baseball bats, 3C electronic materials and industrial products, to expand Advanced’s carbon fiber territory.
07 - Established Golf Ball manufacturing: Launch Technologies Co., LTD.
07 - Established “Advanced Composite Technology (Changshu) Co., Ltd.
10 - Passed certification for ISO14001 and OHSAS18001 to implement the policy of health, safety and environmental protection.
2005
04 - KM intranet operated as of April.
05 - Ministry of Economic Affairs granted: “I-Design Golf set Collaborative Development Project” proposed by Advanced International Multitech Co., Ltd.
12 - Established the Kaohsiung Branch at the Export Processing Zone Administration, Kaohsiung. The main products range from golf clubs, carbon fiber automobile parts, to carbon fiber helmets.
2004
01 - Integrated the procedure operation, application software, data and Web functions among enterprises’ partners by PKM, in order to upgrade the competitive strength of enterprise extension and enable the enterprise group to gain overall profit.
05 - Construction of new plant buildings was scheduled to be finalized in May. Prepared for moving into the new plant buildings which were scheduled to start up at the end of the year.
12 - Invested in establishing Advanced International Group (Vietnam) Co., Ltd in December.
2003
04 - Granted the reimbursement of 9,250,000 for e-system by the Industrial Development Bureau, MOEA in April.
04 - Purchased “Laser Argon Welder” to weld titanium golf heads.
05 - Constructed new plant buildings by investing more than 100,000,000 NTD on May 27.
2002
04 - Applied for transaction of Emerging Stock in April.
04 - Applied for listing of stock in April.
12 - Listed and traded on December 2.
2001
06 - Strategic alliance with renowned graphite shaft manufacturer, Fujikura Composite in June. Proceeded with capital increased by earnings in the amount of 57,844,820 NTD. The paid-in capital was 636,292,940.
08 - Worked with Professor Su,Yi-Hsiung of SooChow University for the SCM project in August.
08 - Formal surface processing operation of Sha Tian Plant added by the subsidiary.
11 - SCM team was incorporated in November to promote the transportation management and upgrade the efficiency of the system and lower costs.
2000
01 - Test run of the 1-Meter wide “PPG material dipping machine” in January.
07 - ERP on-line in July.
08 - Mass production of titanium MW golf head in August.
10 - Start-up of 2nd casting production line in Mainland China in October.
11 - Vacuum titanium casting furnace moved to the plant in November.
1999
02 - Started the marketing guidance in February.
04 - Purchased 2nd CAD equipment in April.
05 - Purchased “rapid prototyping machine” in May.
11 - Capital increased as 556,200,020 NTD in November.
12 - Purchased 1-Meter wide “PPG material dipping machine” in December.
1998
03 - United Enterprise Co., Ltd. trans-invested on March 1 was merged by Dian Precision Casting Co., Ltd.
07 - The affiliates, Dian Precision Casting Co., Ltd and Advanced International Co. Ltd. were merged by Advanced Composite Design Co., Ltd, on July 1, and the capital was increased as 187,170,000 NTD.
08 - Trans-invested in Advanced Group International (BVI) Co., Ltd. in August.
10 - Passed ISO 9001 certification in October.
12 - The capital was increased as 406,200,000 NTD in December, and Securities & Futures Commission, Ministry of Finance approved the issue of shares.
1997
01 - Bike department developed the CROWN fork successfully.
01 - Set up Advanced websites and intranet.
01 - Started promoting the project for merger of Advanced Group, and set the goal to be listed (OTC) in 2000.
1996
09 - Invested in test run and production of coater machines of 2nd production line in September
1995
02 - 6th production line of golf shafts was established in February.
04 - The organization was changed in April and oriented towards the planning of the business division. Meanwhile, the “CIS system” was promoted.
1994
02 - Passed ISO 9002 certification in February.
02 - Trans-invested in Advanced International Co. Ltd.
02 - To cope with the increasing purchase orders, the 5th production line for golf shaft was established.
02 - NPS reform of the golf shaft and bike was carried out this year. The increasing purchase orders were handled in accordance with the new production model.
1993
01 - Invested in United Enterprise Co., Ltd.
03 - The mass production of the fork of carbon fiber bike forks was started.
04 - Introduced automatic filament winding machine from the U.S.A. in April, and worked with “Material Research Laboratory, ITRI” to research and develop filament winding graphite shaft to diversify the shaft to meet customers’ various requirements.
1992
01 - Expansion of plant buildings was carried out at the beginning of the year. The bike production line started producing the “all-in-one carbon fiber bike frame” on a trial basis.
11 - Contracted with Material Research Laboratory, ITRI in November to develop the fork of carbon fiber bike.
1991
04 - Sent personnel to ITRI in Hsinchu to study the production technology of the “all-in-one carbon fiber bike frame” in April. Installed the production equipment in October to launch the production of the “all-in-one carbon fiber bike frame”.
1990
01 - Worked with Material Research Laboratory, ITRI to develop the “all-in-one carbon fiber bike frame”.
1989
01 - Worked with Material Research Laboratory and Mechanical Industry Research Laboratories, ITRI to research and produce PPG material dipping machine and produced PPG to strengthen the autonomy of the required raw materials and diversity of products to decrease the production cost.
1988
07 - The new plant located at No.26 Chung Lin Rd, Siaogang District, Kaohsiung City, Taiwan was founded and started in July, and formally engaged in the mass production of graphite shafts for the domestic market and export.
1987
07 - The company was incorporated by Lin Sen-Chih, Cheng Cheng-Hsien and Cheng Hsi-kun. The initial investment was 45,000,000 NTD. Since the company was incorporated, it has worked with “Material Research Laboratory, Industrial Technology Research Institute (ITRI)” to research and develop graphite shafts.